• Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator
  • Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator
  • Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator
  • Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator
  • Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator
  • Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator

Hydroelectric Small Micro Hydro Power Generator for Power Plant Alternator

After-sales Service: Installation Guide Service
Warranty: 1 Year
Output Type: AC Three Phase
Size: Medium
Type: Horizontal Hydro Generator
Bearing Support: Umbrella Type
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Sichuan, China
Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 7 patents, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
CJA475-W-90
Speed
Low Speed
Bearing Number
2
Standard
Nonstandard
Brand
Wawushan
Power Design
50kw-20MW
Voltage
400V-6300V
Turbine Type
Francis, Turgo, Kaplan, Pelton
Efficiency
90%-95%
Water Head
20-300m
Frequency
20Hz, 60Hz
Lifespan
30 Years
Packaging
Export Standard
OEM
Welcome
Transport Package
Standard Wooden Cases
Specification
ISO 9001`2008
Trademark
WaWuShan
Origin
Sichuan
HS Code
5820039
Production Capacity
200 Sets Per Year

Product Description

Product Description

Small hydro turbine generator for power plant

type water head install capacity
Francis turbine 20-300M 50KW-20MW
Pelton turbine 80-1000M 50KW-20MW
kaplant turbine 3-45M 50KW-10MW
Turgo turbine 30-400M 50KW-10MW
 
Reaction turbines
Reaction turbines are acted on by water, which changes pressure as it moves through the turbine and gives up its energy. They must be encased to contain the water pressure (or suction), or they must be fully submerged in the water flow.
Newton's third law describes the transfer of energy for reaction turbines.
Most water turbines in use are reaction turbines and are used in low (<30m/98 ft) and medium (30-300m/98984 ft) head applications. In reaction turbine pressure drop occurs in both fixed and moving blades.

Impulse turbines
Impulse turbines change the velocity of a water jet. The jet pushes on the turbine's curved blades which changes the direction of the flow. The resulting change in momentum (impulse) causes a force on the turbine blades. Since the turbine is spinning, the force acts through a distance (work) and the diverted water flow is left with diminished energy.
Prior to hitting the turbine blades, the water's pressure (potential energy) is converted to kinetic energy by a nozzle and focused on the turbine. No pressure change occurs at the turbine blades, and the turbine doesn't require a housing for operation.
Newton's second law describes the transfer of energy for impulse turbines.
Impulse turbines are often used in very high (>300m/984 ft) head applications.


Company brief
1. Water turbine generator

We specialize in water turbine manufacturing for over 40years. The water turbines we supplies severs a wide range of costumers in and out of China.

2. Easy installation & operation

We have a wide range of water turbines for building hydraulic generator systems. It is designed of

Easy installation and operation.

3. High efficacy

The water powder generator can be applied in varies place and environment. Our water turbine is produced with high efficacy via our long years experience of research and development.

4. Oversea project

We have exported water turbine generator sets to


Vietnam- - April, 2007(2*3200KW)

Peru- - November, 2007(2*1250KW)

Burma- - December, 2008(2*400KW)

Burma- - November, 2009(2*200KW)

Albania- - July, 2011(2*1250KW, 1*630KW, 2*400KW)

Indonensia----August, 2012(1X4400KW)

Small hydro power plants

Before you can begin planning your systems or estimating how much power you'll produce, you'll need to make four essential measurements:

1. Head (the vertical distance between your intake and turbine)

2. Flow (how much water comes down the stream)

3. Pipeline (Penstock) length

4. Transmission Line length

In this section, we'll discuss how to make these measurements and how they affect the design and efficiency of your hydro system.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
80
Year of Establishment
2003-05-23