Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw

Product Details
Customization: Available
After-sales Service: Installation Guide Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 7 patents, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
  • Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw
Find Similar Products

Basic Info.

Model NO.
GLYWT-300
Output Type
AC Three Phase
Size
Medium
Type
Hydro Power, Hydraulic Power
Bearing Support
Umbrella Type
Speed
Medium Speed
Bearing Number
1
Standard
Nonstandard
Brand Name
Wawushan
Lifespan
50 Years
Power Capacity Range
50kw-20MW
Other Requirement
up to Customer
Transport Package
Standard Wooden Package
Specification
SGS, TUV, BV
Trademark
WAWUSHAN
Origin
China
Production Capacity
180sets /Year

Product Description

Product Description:

Product Overview: Turbine Speed Governor

The Turbine Speed Governor is a high-performance product designed to regulate and maintain the speed of a turbine. It is an essential component in power plants, hydroelectric stations, and other industrial settings where precise control of turbine speed is crucial.

Certifications

The Turbine Speed Governor is certified by CE (Conformité Européenne) and RoHS (Restriction of Hazardous Substances). This ensures that the product meets the necessary safety, health, and environmental standards set by the European Union.

Frequency

The Turbine Speed Governor is compatible with both 50hz and 60hz frequencies, making it suitable for use in various countries and environments.

Control Method

The Turbine Speed Governor utilizes a hydraulic control method, which allows for smooth and precise adjustment of turbine speed. This method is known for its reliability and accuracy, making it an ideal choice for critical applications.

Dc Power

The Turbine Speed Governor operates on a 220V DC power supply, ensuring stable and efficient performance.

Automatic Feature

The Turbine Speed Governor is equipped with an automatic feature that constantly monitors and adjusts the turbine speed to maintain a consistent and optimal level. This eliminates the need for manual intervention, saving time and effort for operators.

In summary, the Turbine Speed Governor is a top-of-the-line product that boasts certifications, compatibility with different frequencies, a reliable control method, efficient power supply, and an automatic feature. It is an essential tool for any industry that requires precise regulation of turbine speed.

 

Features:

  • Product Name: Turbine Speed Governor
  • Response Time: 10 Ms
  • Frequency: 50hz/60hz
  • Ac Power: 220 V
  • Dc Power: 220V
  • Protection Level: IP65
 

Technical Parameters:

Turbine Speed Governor Technical Parameters
Product Name Turbine Speed Governor
PLC Programmable
Weight 300 Kg
Dimensions 200mm X 150mm X 100mm
Control Method Hydraulic
Feature Automatic
AC Power 220 V
Mounting Type Panel Mount
Power Supply 24 VDC
Work Pattern Computer
Certifications CE, RoHS
 

Applications:

Turbine Speed Governor - The Perfect Solution for Hydro Power Plants

The hydro power plant speed governor is a revolutionary product designed to optimize the performance of hydro power plants. With its advanced features and cutting-edge technology, it has become an essential component in the power generation industry. The GLY-2401 model is the latest addition to this series, manufactured in China and weighing only 5 Kg . It is equipped with CE and RoHS certifications, ensuring high quality and safety standards.

Application in Hydro Power Plants

The hydro power plant speed governor is specifically designed for use in hydro power plants, where it plays a crucial role in regulating the speed of the turbines. It is responsible for maintaining a constant speed and ensuring efficient power generation, thereby maximizing the output of the plant. With its precise speed control, it helps in reducing wastage of energy and optimizing the overall performance of the plant.

Scene Setting

Imagine a hydro power plant situated in a remote and rugged location, surrounded by lush green mountains and flowing rivers. The water from the river is used to spin the turbines, which in turn generate electricity. In such a setting, the hydro power plant speed governor is installed to regulate the speed of the turbines and ensure a smooth and uninterrupted flow of electricity.

Product Features

The GLY-2401 is an automatic speed governor, meaning it requires minimal human intervention. It is designed to function with a computer system, making it easy to operate and monitor. The governor also has the capability to work with both 50hz and 60hz frequencies, making it versatile in different power plant setups.

Why Choose the Turbine Speed Governor?

The hydro power plant speed governor is a highly efficient and reliable product, offering numerous benefits to power plant operators. It ensures stable and optimized power generation, reducing operational costs and increasing profits. Its automatic features also reduce the need for manual labor, saving time and resources. With its advanced technology and high-quality standards, it is the preferred choice for hydro power plants worldwide.

Invest in the hydro power plant speed governor today and take your power plant's performance to the next level. Experience the power of technology and witness the difference it can make in your plant's productivity and profitability.

 

Customization:

Brand Name: Hydro Power Plant Speed Governor

Model Number: GLY-2401

Place of Origin: China

Work Pattern: Computer

Plc: Programmable

Weight: 5 Kg

Response Time: 10 Ms

Frequency: 50hz/60hz

Customized Service for Hydro Power Plant Speed Governor

At Hydro Power Plant, we understand that every turbine speed governor is unique and requires specific customization to meet the requirements of our customers. That's why we offer a range of customized services to ensure that our governor, model GLY-2401, is tailored to your specific needs and preferences.

Computerized Work Pattern

Our speed governor is designed to work with a computerized work pattern, allowing for precise control and adjustment of the turbine speed. This ensures optimal performance and efficiency, as well as easy monitoring and maintenance.

Programmable Plc

With a programmable Plc (Programmable Logic Controller), our speed governor can be easily programmed and customized to meet your specific requirements. This allows for flexibility and adaptability, making it suitable for various types of hydro power plants.

Lightweight Design

Weighing only 5 Kg, our speed governor is lightweight and easy to install. This makes it a suitable choice for different types of hydro power plants, including small-scale and remote installations.

Fast Response Time

With a response time of 10 Ms, our speed governor can quickly and accurately adjust the turbine speed, ensuring smooth and efficient operation. This is especially important in emergency situations, where quick response time is critical.

Compatible with 50hz/60hz Frequency

Our speed governor is compatible with both 50hz and 60hz frequency, making it suitable for use in different regions and countries. This allows for a wider range of applications and greater flexibility for our customers.

Choose Hydro Power Plant Speed Governor for reliable, efficient, and customized turbine speed control. Contact us now for more information and to discuss your specific needs.

 

Packing and Shipping:

Turbine Speed Governor Packaging and Shipping

Our Turbine Speed Governor is carefully packaged and shipped to ensure safe delivery to our customers. Here is a breakdown of our packaging and shipping process:

Packaging:
  • The Turbine Speed Governor is first placed in a sturdy box to protect it during transit.
  • We use high-quality foam and bubble wrap to further protect the product from any potential damage.
  • Any additional parts or accessories are also securely packaged with the product.
  • The box is then sealed and labeled with the necessary shipping information.
Shipping:
  • We work with trusted shipping carriers to ensure timely and efficient delivery of our products.
  • The Turbine Speed Governor is shipped using the most appropriate method based on the customer's location and delivery preference.
  • We provide tracking information to our customers so they can monitor the status of their shipment.

At Turbine Speed, we take great care in packaging and shipping our products to ensure they arrive in perfect condition.

 

FAQ:

  • Q: What is the brand name of this product?
    A: The brand name of this product is hydro power plant speed governor.
  • Q: What is the model number of this product?
    A: The model number of this product is GLY-2401.
  • Q: Where is this product manufactured?
    A: This product is manufactured in China.
  • Q: What is the function of this product?
    A: The main function of this product is to control and regulate the speed of a turbine in a hydro power plant.
  • Q: What type of power plant is this product suitable for?
    A: This product is specifically designed for use in hydro power plants.
Hydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kwHydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kwHydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kwHydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kwHydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kwHydro Power Plant Hydraulic PLC Speed Governor for Francis Pelton Kaplan Turgo Hpp 1300kw

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier